Made from rugged industrial plastic, Workdek makes it possible for builders to work safely and efficiently on stable ground, no matter the height.

No more nets, no more scaffolding; just your team and tools wherever you work. To follow are the simple steps to working with Workdek.

Download our installation guide here:

Download

Workdek is made up of 7 key components

The Deck

The Deck

The Legs

The Legs

The Cradle

The Cradle

The Foot

The Foot

Pins

Pins

Straps

Straps

Installing Workdek for ultimate efficiencies and safety

The components that make up the Workdek system are lightweight and easy to install. Yet once locked into place, they’re super-strong and sturdy. Then builders can move anywhere on a work site with full confidence because Workdek prevents the fall and makes light work of building work.

Unpack and Prepare

Unpack and Prepare

Make sure you wear your protective gear and complete a risk assessment and method statement. Speak to your supervisor, line manager or site manager to ensure your Method Statement has been amended.

Once unpacked, stack your panels, legs, base and head plates, securing pins, and cam/securing straps in the area where you are installing the platform.

Ensure you are trained to install Workdek. Once trained, check that you have the correct information about your site. Also be certain that all components are defect-free, that it is safe to work on your site, including the removal of any debris.

Install Workdek

Install Workdek

There are key steps to installing Workdek correctly. We have summarised these below, however, please refer to our installation manual for full instructions.

  1. Assemble all components
  2. Ensure you use the correct Workdek erection technique
  3. Complete a pre-handover inspection
  4. Complete the inspection routine
  5. Check for any faults or damage
Pack down and storage

Pack down and storage

When uninstalling Workdek and returning the components to their storage area, check there is no damage or defects

  1. Set aside any damaged or defective parts to avoid further use
  2. Panels can be pallet stored 25 panels high. Secure these with strapping
  3. Secure the legs (with base and head plates left on) with strapping into 8x8 packs
  4. Place all securing pins and cam/securing straps into suitable containers and store in a dry place
Lego

Read more

Installation is as easy as playing with Lego. Updated installation manual coming soon.

If nets are tying you down and you need to be more productive, it's time to step up with Workdek.