Gallery
Workdek on New Zealand sites
Workdek has been on New Zealand sites since 2019 — single houses, duplexes, multi-unit developments, retirement villages and restoration work. This is the record of it.

Gallery
Workdek on New Zealand residential and multi-unit sites.

Panel and cradle assembly during installation, Tuakau, Waikato, 2021 
Steel truss installation from a continuous deck, Tuakau, Waikato, 2021 
Platform in place before framing, 2024 
Mid-floor deck across a multi-unit build, Naylor Love, 2024 
Hand-pitching trusses from the deck, Naylor Love, 2024 
Truss installation, Summerset, Whangārei, 2024 
Roof framing above a full internal deck, 2023 
Fixing at height from a level surface, 2023 
Underside of the platform showing legs and cradles, 2023 
Panel fixing beside a party wall, Pakuranga, Auckland, 2023 
Structural steel landed over the deck, 2023 
Roof framing from the platform, 2024 
Carrying timber across the deck, 2024 
Top plate work above a fully decked floor, 2019 
On site, 2025 
Delivery to site, 2023 
Panels and legs towed to site, Hamilton, Waikato 
On site, 2024
Where builders use Workdek is described in full on how it works.
Video
Installation, crews at work, and interviews from New Zealand building sites.
Golden Homes
Golden Homes, a national group home builder, did not stop at a trial. They tested internal safety platforms on live sites under real programme pressure from mid-2024, then wrote safety decking into the method statements their sites are required to work to. Eighteen months later, internal safety platforms are standard practice across their building network.
Before the change, framing and truss installation was done from ladders, from narrow top plates, or above internal safety nets — approaches that provide a level of protection but leave crews doing physically demanding work in unstable positions.
After the change they observed safer footing during framing and truss work, fewer awkward postures, reduced risk of tools and materials falling between levels, and a more controlled environment for supervising and training apprentices. The change improved workflow rather than adding friction to it.
Their next step is a regular audit process, to confirm the methods stay embedded over time. The full story is documented in their SafeGuard Awards entry.

- Golden Homes and Workdek — SafeGuard Awards entry
The Golden Homes case study as submitted to the SafeGuard Awards.
PDF · 159 KB
Tell us about your build.
Send us your plans and some details of the build, and one of the team will come back to you with a quote.
