Skip to content

Gallery

Workdek on New Zealand sites

Workdek has been on New Zealand sites since 2019 — single houses, duplexes, multi-unit developments, retirement villages and restoration work. This is the record of it.

Builders fixing timber trusses above a Workdek platform on a retirement village site

Video

Installation, crews at work, and interviews from New Zealand building sites.

Workdek — see a deck go in
Workdek on site
Workdek installation
Working from a Workdek deck
Workdek set-out and install
Workdek in action
Workdek on a New Zealand site

Golden Homes

Golden Homes, a national group home builder, did not stop at a trial. They tested internal safety platforms on live sites under real programme pressure from mid-2024, then wrote safety decking into the method statements their sites are required to work to. Eighteen months later, internal safety platforms are standard practice across their building network.

Before the change, framing and truss installation was done from ladders, from narrow top plates, or above internal safety nets — approaches that provide a level of protection but leave crews doing physically demanding work in unstable positions.

After the change they observed safer footing during framing and truss work, fewer awkward postures, reduced risk of tools and materials falling between levels, and a more controlled environment for supervising and training apprentices. The change improved workflow rather than adding friction to it.

Their next step is a regular audit process, to confirm the methods stay embedded over time. The full story is documented in their SafeGuard Awards entry.

Crews installing steel roof trusses over Workdek decks on a Tuakau site
Steel roof trusses going on with the help of Workdek on a Golden Homes site in Tuakau.

Tell us about your build.

Send us your plans and some details of the build, and one of the team will come back to you with a quote.

Get a quote